Part of the preparation work is to optimize the antenna’s for the situation on the island. Working with the limitations of antenna height and the possibilities of a beach location on an Island in the Pacific Ocean can be challenging for low band antenna’s.
Martin PA4WM got some help from Dado E74AW resulting in some promissing plots…..
Getting the antenna’s there……
With 85 days to go it is time to get the first boxes shipped.
For save transportation of the antenna’s to Swains Ronald PA3EWP and his “handyman” Fred constructed some tailormade boxes. Previous DXpeditions showed him that this kind of boxes survive the long journey to the Pacific.
Just after Xmas these boxes will be filled with gear and shipped for W8S







You must be logged in to post a comment.